Revision · indicator 1891

Necesidad cubierta de energías mFRR a bajar de activación programada

Period2026-10-22 – 2026-10-25
Published by REE2026-10-25 22:07Times in peninsular Spanish time.
Detected by Joltio2026-10-25 23:231.3 h later
Revised values1 · Gaps filled 0 · Removed 0Not revisions: 0 newly published · 100 first load
Largest correction60

Value details

Besides the revisions, this reload brought 0 newly published values (after the last one we had) and 100 values of days no earlier reload covered. Neither is a REE revision.

Sign in with a Professional or Enterprise plan to see every changed value, with its value before and after.

Sign in