Revision · indicator 1891
Necesidad cubierta de energías mFRR a bajar de activación programada
Period2026-11-12 – 2026-11-15
Published by REE2026-11-15 22:56Times in peninsular Spanish time.
Detected by Joltio2026-11-15 23:220.4 h later
Revised values2 · Gaps filled 0 · Removed 0Not revisions: 0 newly published · 192 first load
Largest correction340
Value details
Besides the revisions, this reload brought 0 newly published values (after the last one we had) and 192 values of days no earlier reload covered. Neither is a REE revision.
Sign in with a Professional or Enterprise plan to see every changed value, with its value before and after.
Sign in