Revision · indicator 1892

Necesidad cubierta de energías mFRR a subir de activación programada

Period2026-11-11 – 2026-11-14
Published by REE2026-11-14 00:55Times in peninsular Spanish time.
Detected by Joltio2026-11-14 01:020.1 h later
Revised values1 · Gaps filled 0 · Removed 0Not revisions: 0 newly published · 96 first load
Largest correction140

Value details

Besides the revisions, this reload brought 0 newly published values (after the last one we had) and 96 values of days no earlier reload covered. Neither is a REE revision.

Sign in with a Professional or Enterprise plan to see every changed value, with its value before and after.

Sign in