Indicator revisions

ESIOS can correct indicator values after publication. This history shows what changed in each reload.

IndicatorPeriodRevised valuesGaps filledRemovedLargest correctionDetected
Previsión diaria de la demanda eléctrica peninsular en el mercado#25632026-09-26 / 2026-10-06721 (68.34 %)005682026-09-29 11:12
Generación programada P48 Hibridación#21312026-09-26 / 2026-09-292 (0.52 %)0022026-09-29 11:11
Generación T.Real consumo bombeo#20782026-09-26 / 2026-09-291 (1.41 %)0022026-09-29 11:11
Demanda Programada total territorios no peninsulares#19422026-09-26 / 2026-09-29108 (1.17 %)00122026-09-29 11:11
Demanda programada SNP#17412026-09-26 / 2026-09-29168 (1.71 %)00122026-09-29 11:09
Demanda prevista SNP#17422026-09-26 / 2026-09-301,513 (13.44 %)00142026-09-29 11:09
Demanda Real SNP#17402026-09-26 / 2026-09-293 (1.44 %)000.22026-09-29 11:09
Previsión semanal de la demanda eléctrica peninsular#6032026-09-26 / 2026-10-11666 (43.39 %)004912026-09-29 11:05
Demanda prevista#5442026-09-26 / 2026-09-29184 (15.99 %)002922026-09-29 11:05
Demanda programada#5452026-09-26 / 2026-09-29177 (15.38 %)001,2292026-09-29 11:05
Generación prevista Solar fotovoltaica#5422026-09-26 / 2026-10-08490 (39.29 %)003,3512026-09-29 11:04
Previsión de la producción eólica peninsular#5412026-09-26 / 2026-10-08920 (73.78 %)003,4992026-09-29 11:04
Generación prevista Solar térmica#5432026-09-26 / 2026-10-08856 (68.64 %)002842026-09-29 11:04
Capacidad de intercambio (NTC) con Portugal importación#4892026-09-26 / 2026-09-2916 (4.18 %)001,7352026-09-29 11:04
Previsión diaria de la demanda eléctrica peninsular#4602026-09-26 / 2026-10-06725 (68.72 %)007562026-09-29 11:04
Demanda programada P48 Consumos directos en mercado#3672026-09-26 / 2026-09-2911 (2.87 %)000.7752026-09-29 11:04
Demanda programada P48 Comercializadores de referencia#3662026-09-26 / 2026-09-298 (2.09 %)001.52026-09-29 11:04
Demanda programada P48 Comercializadores mercado libre#3652026-09-26 / 2026-09-2956 (14.62 %)0038.22026-09-29 11:04
Generación programada P48 Genéricas#972026-09-26 / 2026-09-291 (4.35 %)001.252026-09-29 10:12
Generación programada P48 Residuos varios#942026-09-26 / 2026-09-295 (1.31 %)003.52026-09-29 10:12
Generación programada P48 Gas Natural Cogeneración#872026-09-26 / 2026-09-295 (1.31 %)001.82026-09-29 10:12
Precio medio ponderado regulación terciaria a subir#103862026-09-26 / 2026-09-293 (0.78 %)00215.832026-09-29 10:08
CO2 Asociado Generación T.Real SNP#103562026-09-26 / 2026-09-291 (1.35 %)0002026-09-29 10:08
Generación T.Real no renovable SNP#103542026-09-26 / 2026-09-291 (1.35 %)000.022026-09-29 10:08
Demanda real suma de generación SNP#103502026-09-26 / 2026-09-291 (1.24 %)000.022026-09-29 10:07
Demanda programada P48 total#100272026-09-26 / 2026-09-2960 (15.67 %)00469.52026-09-29 10:05
Generación prevista Solar#100342026-09-26 / 2026-10-08872 (69.93 %)003,8242026-09-29 10:05
Generación programada P48 Eólica#100102026-09-26 / 2026-09-2962 (16.19 %)0038.552026-09-29 10:05
Generación programada P48 Saldo Portugal#100142026-09-26 / 2026-09-293 (0.78 %)0024.752026-09-29 10:05
Saldo total interconexiones programa p48#100262026-09-26 / 2026-09-2917 (4.44 %)0095.8252026-09-29 10:05
Previsión diaria de la demanda eléctrica peninsular en el mercado#25632026-09-26 / 2026-10-06728 (69.00 %)004002026-09-29 10:04
Almacenamiento T.Real Carga Baterías#21662026-09-26 / 2026-09-291 (0.41 %)0032026-09-29 10:04
Generación programada P48 Hibridación#21312026-09-26 / 2026-09-2941 (10.70 %)003.3752026-09-29 10:03
Generación T.Real turbinación bombeo#20792026-09-26 / 2026-09-291 (0.41 %)004952026-09-29 10:03
Demanda real nacional#20372026-09-26 / 2026-09-292 (2.55 %)0012026-09-29 10:03
Demanda Programada total territorios no peninsulares#19422026-09-26 / 2026-09-2960 (0.65 %)0052026-09-29 10:03
Generación T.Real ciclo combinado SNP#17462026-09-26 / 2026-09-291 (2.37 %)000.42026-09-29 10:02
Demanda prevista SNP#17422026-09-26 / 2026-09-301,769 (15.93 %)0013.932026-09-29 10:02
Demanda programada SNP#17412026-09-26 / 2026-09-2936 (0.75 %)0022026-09-29 10:02
Precio medio cuarto horario final#8172026-09-26 / 2026-09-29220 (57.44 %)0018.862026-09-29 10:01
Precio medio cuarto horario componente desvíos#8122026-09-26 / 2026-09-29101 (26.37 %)003.042026-09-29 10:01
Precio medio cuarto horario componente saldo desvíos#8132026-09-26 / 2026-09-2920 (5.22 %)000.032026-09-29 10:01
Precio medio cuarto horario componente banda secundaria#8112026-09-26 / 2026-09-29120 (31.33 %)000.172026-09-29 10:01
Precio medio cuarto horario componente saldo desvíos contratación libre#8002026-09-26 / 2026-09-2920 (5.22 %)000.032026-09-29 10:01
Precio medio cuarto horario componente restricciones PBF#8062026-09-26 / 2026-09-29196 (51.17 %)0018.992026-09-29 10:01
Coste de solución de Restricciones técnicas diario#7092026-09-26 / 2026-09-2997 (25.33 %)00132,763.332026-09-29 10:01
Precio medio restricciones técnicas diario Fase I bajar#7062026-09-26 / 2026-09-2987 (30.21 %)0030,173.492026-09-29 10:01
Almacenamiento programado P48 Entrega Baterías#21432026-09-28 / 2026-09-290 (2.78 %)0102026-09-29 09:50
Generación programada P48 Exportación Francia#1022026-09-28 / 2026-09-299 (4.89 %)0015.0252026-09-29 09:49
Generación programada P48 Importación Francia#982026-09-28 / 2026-09-295 (5.76 %)1280.5252026-09-29 09:47
Previsión diaria de la demanda eléctrica peninsular en el mercado#2563 · 2026-09-26 / 2026-10-06Revised values: 721 (68.34 %)Gaps filled: 0 · Removed: 0Largest correction: 568Detected: 2026-09-29 11:12
Generación programada P48 Hibridación#2131 · 2026-09-26 / 2026-09-29Revised values: 2 (0.52 %)Gaps filled: 0 · Removed: 0Largest correction: 2Detected: 2026-09-29 11:11
Generación T.Real consumo bombeo#2078 · 2026-09-26 / 2026-09-29Revised values: 1 (1.41 %)Gaps filled: 0 · Removed: 0Largest correction: 2Detected: 2026-09-29 11:11
Demanda Programada total territorios no peninsulares#1942 · 2026-09-26 / 2026-09-29Revised values: 108 (1.17 %)Gaps filled: 0 · Removed: 0Largest correction: 12Detected: 2026-09-29 11:11
Demanda programada SNP#1741 · 2026-09-26 / 2026-09-29Revised values: 168 (1.71 %)Gaps filled: 0 · Removed: 0Largest correction: 12Detected: 2026-09-29 11:09
Demanda prevista SNP#1742 · 2026-09-26 / 2026-09-30Revised values: 1,513 (13.44 %)Gaps filled: 0 · Removed: 0Largest correction: 14Detected: 2026-09-29 11:09
Demanda Real SNP#1740 · 2026-09-26 / 2026-09-29Revised values: 3 (1.44 %)Gaps filled: 0 · Removed: 0Largest correction: 0.2Detected: 2026-09-29 11:09
Previsión semanal de la demanda eléctrica peninsular#603 · 2026-09-26 / 2026-10-11Revised values: 666 (43.39 %)Gaps filled: 0 · Removed: 0Largest correction: 491Detected: 2026-09-29 11:05
Demanda prevista#544 · 2026-09-26 / 2026-09-29Revised values: 184 (15.99 %)Gaps filled: 0 · Removed: 0Largest correction: 292Detected: 2026-09-29 11:05
Demanda programada#545 · 2026-09-26 / 2026-09-29Revised values: 177 (15.38 %)Gaps filled: 0 · Removed: 0Largest correction: 1,229Detected: 2026-09-29 11:05
Generación prevista Solar fotovoltaica#542 · 2026-09-26 / 2026-10-08Revised values: 490 (39.29 %)Gaps filled: 0 · Removed: 0Largest correction: 3,351Detected: 2026-09-29 11:04
Previsión de la producción eólica peninsular#541 · 2026-09-26 / 2026-10-08Revised values: 920 (73.78 %)Gaps filled: 0 · Removed: 0Largest correction: 3,499Detected: 2026-09-29 11:04
Generación prevista Solar térmica#543 · 2026-09-26 / 2026-10-08Revised values: 856 (68.64 %)Gaps filled: 0 · Removed: 0Largest correction: 284Detected: 2026-09-29 11:04
Capacidad de intercambio (NTC) con Portugal importación#489 · 2026-09-26 / 2026-09-29Revised values: 16 (4.18 %)Gaps filled: 0 · Removed: 0Largest correction: 1,735Detected: 2026-09-29 11:04
Previsión diaria de la demanda eléctrica peninsular#460 · 2026-09-26 / 2026-10-06Revised values: 725 (68.72 %)Gaps filled: 0 · Removed: 0Largest correction: 756Detected: 2026-09-29 11:04
Demanda programada P48 Consumos directos en mercado#367 · 2026-09-26 / 2026-09-29Revised values: 11 (2.87 %)Gaps filled: 0 · Removed: 0Largest correction: 0.775Detected: 2026-09-29 11:04
Demanda programada P48 Comercializadores de referencia#366 · 2026-09-26 / 2026-09-29Revised values: 8 (2.09 %)Gaps filled: 0 · Removed: 0Largest correction: 1.5Detected: 2026-09-29 11:04
Demanda programada P48 Comercializadores mercado libre#365 · 2026-09-26 / 2026-09-29Revised values: 56 (14.62 %)Gaps filled: 0 · Removed: 0Largest correction: 38.2Detected: 2026-09-29 11:04
Generación programada P48 Genéricas#97 · 2026-09-26 / 2026-09-29Revised values: 1 (4.35 %)Gaps filled: 0 · Removed: 0Largest correction: 1.25Detected: 2026-09-29 10:12
Generación programada P48 Residuos varios#94 · 2026-09-26 / 2026-09-29Revised values: 5 (1.31 %)Gaps filled: 0 · Removed: 0Largest correction: 3.5Detected: 2026-09-29 10:12
Generación programada P48 Gas Natural Cogeneración#87 · 2026-09-26 / 2026-09-29Revised values: 5 (1.31 %)Gaps filled: 0 · Removed: 0Largest correction: 1.8Detected: 2026-09-29 10:12
Precio medio ponderado regulación terciaria a subir#10386 · 2026-09-26 / 2026-09-29Revised values: 3 (0.78 %)Gaps filled: 0 · Removed: 0Largest correction: 215.83Detected: 2026-09-29 10:08
CO2 Asociado Generación T.Real SNP#10356 · 2026-09-26 / 2026-09-29Revised values: 1 (1.35 %)Gaps filled: 0 · Removed: 0Largest correction: 0Detected: 2026-09-29 10:08
Generación T.Real no renovable SNP#10354 · 2026-09-26 / 2026-09-29Revised values: 1 (1.35 %)Gaps filled: 0 · Removed: 0Largest correction: 0.02Detected: 2026-09-29 10:08
Demanda real suma de generación SNP#10350 · 2026-09-26 / 2026-09-29Revised values: 1 (1.24 %)Gaps filled: 0 · Removed: 0Largest correction: 0.02Detected: 2026-09-29 10:07
Demanda programada P48 total#10027 · 2026-09-26 / 2026-09-29Revised values: 60 (15.67 %)Gaps filled: 0 · Removed: 0Largest correction: 469.5Detected: 2026-09-29 10:05
Generación prevista Solar#10034 · 2026-09-26 / 2026-10-08Revised values: 872 (69.93 %)Gaps filled: 0 · Removed: 0Largest correction: 3,824Detected: 2026-09-29 10:05
Generación programada P48 Eólica#10010 · 2026-09-26 / 2026-09-29Revised values: 62 (16.19 %)Gaps filled: 0 · Removed: 0Largest correction: 38.55Detected: 2026-09-29 10:05
Generación programada P48 Saldo Portugal#10014 · 2026-09-26 / 2026-09-29Revised values: 3 (0.78 %)Gaps filled: 0 · Removed: 0Largest correction: 24.75Detected: 2026-09-29 10:05
Saldo total interconexiones programa p48#10026 · 2026-09-26 / 2026-09-29Revised values: 17 (4.44 %)Gaps filled: 0 · Removed: 0Largest correction: 95.825Detected: 2026-09-29 10:05
Previsión diaria de la demanda eléctrica peninsular en el mercado#2563 · 2026-09-26 / 2026-10-06Revised values: 728 (69.00 %)Gaps filled: 0 · Removed: 0Largest correction: 400Detected: 2026-09-29 10:04
Almacenamiento T.Real Carga Baterías#2166 · 2026-09-26 / 2026-09-29Revised values: 1 (0.41 %)Gaps filled: 0 · Removed: 0Largest correction: 3Detected: 2026-09-29 10:04
Generación programada P48 Hibridación#2131 · 2026-09-26 / 2026-09-29Revised values: 41 (10.70 %)Gaps filled: 0 · Removed: 0Largest correction: 3.375Detected: 2026-09-29 10:03
Generación T.Real turbinación bombeo#2079 · 2026-09-26 / 2026-09-29Revised values: 1 (0.41 %)Gaps filled: 0 · Removed: 0Largest correction: 495Detected: 2026-09-29 10:03
Demanda real nacional#2037 · 2026-09-26 / 2026-09-29Revised values: 2 (2.55 %)Gaps filled: 0 · Removed: 0Largest correction: 1Detected: 2026-09-29 10:03
Demanda Programada total territorios no peninsulares#1942 · 2026-09-26 / 2026-09-29Revised values: 60 (0.65 %)Gaps filled: 0 · Removed: 0Largest correction: 5Detected: 2026-09-29 10:03
Generación T.Real ciclo combinado SNP#1746 · 2026-09-26 / 2026-09-29Revised values: 1 (2.37 %)Gaps filled: 0 · Removed: 0Largest correction: 0.4Detected: 2026-09-29 10:02
Demanda prevista SNP#1742 · 2026-09-26 / 2026-09-30Revised values: 1,769 (15.93 %)Gaps filled: 0 · Removed: 0Largest correction: 13.93Detected: 2026-09-29 10:02
Demanda programada SNP#1741 · 2026-09-26 / 2026-09-29Revised values: 36 (0.75 %)Gaps filled: 0 · Removed: 0Largest correction: 2Detected: 2026-09-29 10:02
Precio medio cuarto horario final#817 · 2026-09-26 / 2026-09-29Revised values: 220 (57.44 %)Gaps filled: 0 · Removed: 0Largest correction: 18.86Detected: 2026-09-29 10:01
Precio medio cuarto horario componente desvíos#812 · 2026-09-26 / 2026-09-29Revised values: 101 (26.37 %)Gaps filled: 0 · Removed: 0Largest correction: 3.04Detected: 2026-09-29 10:01
Precio medio cuarto horario componente saldo desvíos#813 · 2026-09-26 / 2026-09-29Revised values: 20 (5.22 %)Gaps filled: 0 · Removed: 0Largest correction: 0.03Detected: 2026-09-29 10:01
Precio medio cuarto horario componente banda secundaria#811 · 2026-09-26 / 2026-09-29Revised values: 120 (31.33 %)Gaps filled: 0 · Removed: 0Largest correction: 0.17Detected: 2026-09-29 10:01
Precio medio cuarto horario componente saldo desvíos contratación libre#800 · 2026-09-26 / 2026-09-29Revised values: 20 (5.22 %)Gaps filled: 0 · Removed: 0Largest correction: 0.03Detected: 2026-09-29 10:01
Precio medio cuarto horario componente restricciones PBF#806 · 2026-09-26 / 2026-09-29Revised values: 196 (51.17 %)Gaps filled: 0 · Removed: 0Largest correction: 18.99Detected: 2026-09-29 10:01
Coste de solución de Restricciones técnicas diario#709 · 2026-09-26 / 2026-09-29Revised values: 97 (25.33 %)Gaps filled: 0 · Removed: 0Largest correction: 132,763.33Detected: 2026-09-29 10:01
Precio medio restricciones técnicas diario Fase I bajar#706 · 2026-09-26 / 2026-09-29Revised values: 87 (30.21 %)Gaps filled: 0 · Removed: 0Largest correction: 30,173.49Detected: 2026-09-29 10:01
Almacenamiento programado P48 Entrega Baterías#2143 · 2026-09-28 / 2026-09-29Revised values: 0 (2.78 %)Gaps filled: 0 · Removed: 1Largest correction: 0Detected: 2026-09-29 09:50
Generación programada P48 Exportación Francia#102 · 2026-09-28 / 2026-09-29Revised values: 9 (4.89 %)Gaps filled: 0 · Removed: 0Largest correction: 15.025Detected: 2026-09-29 09:49
Generación programada P48 Importación Francia#98 · 2026-09-28 / 2026-09-29Revised values: 5 (5.76 %)Gaps filled: 1 · Removed: 2Largest correction: 80.525Detected: 2026-09-29 09:47
More revisions