Indicator revisions
ESIOS can correct indicator values after publication. This history shows what changed in each reload.
| Indicator | Period | Revised values | Gaps filled | Removed | Largest correction | Detected |
|---|---|---|---|---|---|---|
| Generación programada P48 Turbinación bombeo#73 | 2026-11-09 / 2026-11-12 | 3 (1.16 %) | 0 | 0 | 10 | 2026-11-12 19:09 |
| Generación programada P48 Hidráulica UGH#71 | 2026-11-09 / 2026-11-12 | 9 (2.35 %) | 0 | 0 | 5 | 2026-11-12 19:09 |
| Precio medio ponderado regulación terciaria a subir de activación programada (AP)#10398 | 2026-11-09 / 2026-11-12 | 4 (1.04 %) | 0 | 0 | 189.5 | 2026-11-12 19:06 |
| Generación prevista Solar#10034 | 2026-11-12 / 2026-11-21 | 666 (74.66 %) | 0 | 0 | 1,848 | 2026-11-12 19:05 |
| Saldo total interconexiones programa p48#10026 | 2026-11-09 / 2026-11-12 | 24 (6.27 %) | 0 | 0 | 75 | 2026-11-12 19:04 |
| Demanda programada P48 total#10027 | 2026-11-09 / 2026-11-12 | 22 (5.74 %) | 0 | 0 | 510.1 | 2026-11-12 19:04 |
| Generación programada P48 Saldo Portugal#10014 | 2026-11-09 / 2026-11-12 | 19 (4.96 %) | 0 | 0 | 75 | 2026-11-12 19:04 |
| Generación programada P48 Cogeneración#10011 | 2026-11-09 / 2026-11-12 | 23 (6.01 %) | 0 | 0 | 7.325 | 2026-11-12 19:04 |
| Generación programada P48 Eólica#10010 | 2026-11-09 / 2026-11-12 | 24 (6.27 %) | 0 | 0 | 65.75 | 2026-11-12 19:04 |
| Demanda real suma de generación#10004 | 2026-11-09 / 2026-11-12 | 1 (1.19 %) | 0 | 0 | 16 | 2026-11-12 19:04 |
| Generación programada P48 Carbón#10008 | 2026-11-11 / 2026-11-12 | 3 (3.00 %) | 0 | 0 | 1.5 | 2026-11-12 19:04 |
| Previsión diaria de la demanda eléctrica peninsular en el mercado#2563 | 2026-11-09 / 2026-11-19 | 690 (65.40 %) | 0 | 0 | 651 | 2026-11-12 19:04 |
| Demanda real nacional#2037 | 2026-11-09 / 2026-11-12 | 2 (1.28 %) | 0 | 0 | 1 | 2026-11-12 19:03 |
| Necesidad cubierta de energías mFRR a subir de activación programada#1892 | 2026-11-09 / 2026-11-12 | 9 (2.35 %) | 0 | 0 | 1,700 | 2026-11-12 19:03 |
| Volumen neto de los desvíos generación-demanda#1338 | 2026-11-09 / 2026-11-12 | 96 (28.41 %) | 0 | 0 | 155.2 | 2026-11-12 18:16 |
| Precio medio cuarto horario componente banda secundaria#811 | 2026-11-09 / 2026-11-12 | 188 (49.09 %) | 0 | 0 | 0.75 | 2026-11-12 18:16 |
| Precio de pago desvíos a bajar#687 | 2026-11-09 / 2026-11-12 | 93 (27.58 %) | 0 | 0 | 258.28 | 2026-11-12 18:15 |
| Precio de cobro desvíos a subir#686 | 2026-11-09 / 2026-11-12 | 97 (28.69 %) | 0 | 0 | 195.14 | 2026-11-12 18:15 |
| Generación prevista Solar fotovoltaica#542 | 2026-11-12 / 2026-11-21 | 394 (44.17 %) | 0 | 0 | 2,539 | 2026-11-12 18:14 |
| Demanda programada Peninsular#545 | 2026-11-09 / 2026-11-13 | 102 (8.59 %) | 0 | 0 | 1,504 | 2026-11-12 18:13 |
| Generación prevista Solar térmica#543 | 2026-11-12 / 2026-11-21 | 475 (53.25 %) | 0 | 0 | 13 | 2026-11-12 18:13 |
| Demanda prevista Peninsular#544 | 2026-11-09 / 2026-11-13 | 118 (9.94 %) | 0 | 0 | 220 | 2026-11-12 18:13 |
| Previsión de la producción eólica peninsular#541 | 2026-11-09 / 2026-11-21 | 884 (70.89 %) | 0 | 0 | 1,154 | 2026-11-12 18:13 |
| Previsión diaria de la demanda eléctrica peninsular#460 | 2026-11-09 / 2026-11-19 | 690 (65.40 %) | 0 | 0 | 253 | 2026-11-12 18:13 |
| Generación programada P48 Exportación Portugal#103 | 2026-11-09 / 2026-11-12 | 10 (2.62 %) | 0 | 0 | 37.35 | 2026-11-12 18:11 |
| Generación programada P48 Exportación Francia#102 | 2026-11-09 / 2026-11-12 | 14 (3.66 %) | 0 | 0 | 61.125 | 2026-11-12 18:11 |
| Generación programada P48 Genéricas#97 | 2026-11-09 / 2026-11-12 | 3 (3.36 %) | 1 | 0 | 2.175 | 2026-11-12 18:11 |
| Generación programada P48 Importación Portugal#99 | 2026-11-09 / 2026-11-12 | 13 (3.78 %) | 1 | 0 | 75 | 2026-11-12 18:11 |
| Generación programada P48 Importación Francia#98 | 2026-11-09 / 2026-11-12 | 1 (2.15 %) | 3 | 0 | 3.15 | 2026-11-12 18:11 |
| Generación programada P48 Consumo bombeo#95 | 2026-11-09 / 2026-11-12 | 2 (0.66 %) | 0 | 0 | 158.25 | 2026-11-12 18:11 |
| Generación programada P48 Solar térmica#85 | 2026-11-09 / 2026-11-12 | 8 (2.43 %) | 0 | 0 | 10.125 | 2026-11-12 18:11 |
| Generación programada P48 Biomasa#91 | 2026-11-09 / 2026-11-12 | 10 (2.61 %) | 0 | 0 | 8 | 2026-11-12 18:11 |
| Generación programada P48 Solar fotovoltaica#84 | 2026-11-09 / 2026-11-12 | 8 (2.83 %) | 0 | 0 | 41.15 | 2026-11-12 18:10 |
| Generación programada P48 Eólica terrestre#82 | 2026-11-09 / 2026-11-12 | 30 (7.83 %) | 0 | 0 | 57.65 | 2026-11-12 18:10 |
| Generación programada P48 Turbinación bombeo#73 | 2026-11-09 / 2026-11-12 | 3 (1.16 %) | 0 | 0 | 102.75 | 2026-11-12 18:10 |
| Generación programada P48 Ciclo combinado#79 | 2026-11-09 / 2026-11-12 | 20 (5.22 %) | 0 | 0 | 400.575 | 2026-11-12 18:10 |
| Generación programada P48 Hidráulica no UGH#72 | 2026-11-09 / 2026-11-12 | 8 (2.09 %) | 0 | 0 | 1.925 | 2026-11-12 18:10 |
| Generación programada P48 Hidráulica UGH#71 | 2026-11-09 / 2026-11-12 | 7 (1.83 %) | 0 | 0 | 167.75 | 2026-11-12 18:10 |
| Precio medio ponderado regulación terciaria a subir de activación directa (AD)#10400 | 2026-11-09 / 2026-11-12 | 2 (0.52 %) | 0 | 0 | 201.95 | 2026-11-12 18:07 |
| Precio medio ponderado regulación terciaria a subir de activación programada (AP)#10398 | 2026-11-09 / 2026-11-12 | 10 (2.61 %) | 0 | 0 | 200.01 | 2026-11-12 18:07 |
| Asignación a subir de energías mFRR SEE#10395 | 2026-11-09 / 2026-11-12 | 1 (2.23 %) | 0 | 0 | 390 | 2026-11-12 18:07 |
| Generación prevista Solar#10034 | 2026-11-12 / 2026-11-21 | 640 (71.75 %) | 0 | 0 | 2,534 | 2026-11-12 18:05 |
| Demanda programada P48 total#10027 | 2026-11-09 / 2026-11-12 | 32 (8.36 %) | 0 | 0 | 539.375 | 2026-11-12 18:05 |
| Saldo total interconexiones programa p48#10026 | 2026-11-09 / 2026-11-12 | 30 (7.83 %) | 0 | 0 | 75.925 | 2026-11-12 18:05 |
| Generación programada P48 Eólica#10010 | 2026-11-09 / 2026-11-12 | 30 (7.83 %) | 0 | 0 | 57.65 | 2026-11-12 18:05 |
| Generación programada P48 Saldo Portugal#10014 | 2026-11-09 / 2026-11-12 | 20 (5.22 %) | 0 | 0 | 75.925 | 2026-11-12 18:05 |
| Generación programada P48 Cogeneración#10011 | 2026-11-09 / 2026-11-12 | 27 (7.05 %) | 0 | 0 | 12.225 | 2026-11-12 18:04 |
| Generación programada P48 Carbón#10008 | 2026-11-11 / 2026-11-12 | 6 (6.00 %) | 0 | 0 | 8.75 | 2026-11-12 18:04 |
| Necesidad cubierta de energías mFRR a subir de activación programada#1892 | 2026-11-09 / 2026-11-12 | 4 (1.04 %) | 0 | 0 | 1,670 | 2026-11-12 18:03 |
| Precio medio horario final comercializadores de referencia suma de componentes#10212 | 2026-11-09 / 2026-11-12 | 192 (50.13 %) | 0 | 0 | 164.11 | 2026-11-12 18:02 |
Generación programada P48 Turbinación bombeo#73 · 2026-11-09 / 2026-11-12Revised values: 3 (1.16 %)Gaps filled: 0 · Removed: 0Largest correction: 10Detected: 2026-11-12 19:09
Generación programada P48 Hidráulica UGH#71 · 2026-11-09 / 2026-11-12Revised values: 9 (2.35 %)Gaps filled: 0 · Removed: 0Largest correction: 5Detected: 2026-11-12 19:09
Precio medio ponderado regulación terciaria a subir de activación programada (AP)#10398 · 2026-11-09 / 2026-11-12Revised values: 4 (1.04 %)Gaps filled: 0 · Removed: 0Largest correction: 189.5Detected: 2026-11-12 19:06
Generación prevista Solar#10034 · 2026-11-12 / 2026-11-21Revised values: 666 (74.66 %)Gaps filled: 0 · Removed: 0Largest correction: 1,848Detected: 2026-11-12 19:05
Saldo total interconexiones programa p48#10026 · 2026-11-09 / 2026-11-12Revised values: 24 (6.27 %)Gaps filled: 0 · Removed: 0Largest correction: 75Detected: 2026-11-12 19:04
Demanda programada P48 total#10027 · 2026-11-09 / 2026-11-12Revised values: 22 (5.74 %)Gaps filled: 0 · Removed: 0Largest correction: 510.1Detected: 2026-11-12 19:04
Generación programada P48 Saldo Portugal#10014 · 2026-11-09 / 2026-11-12Revised values: 19 (4.96 %)Gaps filled: 0 · Removed: 0Largest correction: 75Detected: 2026-11-12 19:04
Generación programada P48 Cogeneración#10011 · 2026-11-09 / 2026-11-12Revised values: 23 (6.01 %)Gaps filled: 0 · Removed: 0Largest correction: 7.325Detected: 2026-11-12 19:04
Generación programada P48 Eólica#10010 · 2026-11-09 / 2026-11-12Revised values: 24 (6.27 %)Gaps filled: 0 · Removed: 0Largest correction: 65.75Detected: 2026-11-12 19:04
Demanda real suma de generación#10004 · 2026-11-09 / 2026-11-12Revised values: 1 (1.19 %)Gaps filled: 0 · Removed: 0Largest correction: 16Detected: 2026-11-12 19:04
Generación programada P48 Carbón#10008 · 2026-11-11 / 2026-11-12Revised values: 3 (3.00 %)Gaps filled: 0 · Removed: 0Largest correction: 1.5Detected: 2026-11-12 19:04
Previsión diaria de la demanda eléctrica peninsular en el mercado#2563 · 2026-11-09 / 2026-11-19Revised values: 690 (65.40 %)Gaps filled: 0 · Removed: 0Largest correction: 651Detected: 2026-11-12 19:04
Demanda real nacional#2037 · 2026-11-09 / 2026-11-12Revised values: 2 (1.28 %)Gaps filled: 0 · Removed: 0Largest correction: 1Detected: 2026-11-12 19:03
Necesidad cubierta de energías mFRR a subir de activación programada#1892 · 2026-11-09 / 2026-11-12Revised values: 9 (2.35 %)Gaps filled: 0 · Removed: 0Largest correction: 1,700Detected: 2026-11-12 19:03
Volumen neto de los desvíos generación-demanda#1338 · 2026-11-09 / 2026-11-12Revised values: 96 (28.41 %)Gaps filled: 0 · Removed: 0Largest correction: 155.2Detected: 2026-11-12 18:16
Precio medio cuarto horario componente banda secundaria#811 · 2026-11-09 / 2026-11-12Revised values: 188 (49.09 %)Gaps filled: 0 · Removed: 0Largest correction: 0.75Detected: 2026-11-12 18:16
Precio de pago desvíos a bajar#687 · 2026-11-09 / 2026-11-12Revised values: 93 (27.58 %)Gaps filled: 0 · Removed: 0Largest correction: 258.28Detected: 2026-11-12 18:15
Precio de cobro desvíos a subir#686 · 2026-11-09 / 2026-11-12Revised values: 97 (28.69 %)Gaps filled: 0 · Removed: 0Largest correction: 195.14Detected: 2026-11-12 18:15
Generación prevista Solar fotovoltaica#542 · 2026-11-12 / 2026-11-21Revised values: 394 (44.17 %)Gaps filled: 0 · Removed: 0Largest correction: 2,539Detected: 2026-11-12 18:14
Demanda programada Peninsular#545 · 2026-11-09 / 2026-11-13Revised values: 102 (8.59 %)Gaps filled: 0 · Removed: 0Largest correction: 1,504Detected: 2026-11-12 18:13
Generación prevista Solar térmica#543 · 2026-11-12 / 2026-11-21Revised values: 475 (53.25 %)Gaps filled: 0 · Removed: 0Largest correction: 13Detected: 2026-11-12 18:13
Demanda prevista Peninsular#544 · 2026-11-09 / 2026-11-13Revised values: 118 (9.94 %)Gaps filled: 0 · Removed: 0Largest correction: 220Detected: 2026-11-12 18:13
Previsión de la producción eólica peninsular#541 · 2026-11-09 / 2026-11-21Revised values: 884 (70.89 %)Gaps filled: 0 · Removed: 0Largest correction: 1,154Detected: 2026-11-12 18:13
Previsión diaria de la demanda eléctrica peninsular#460 · 2026-11-09 / 2026-11-19Revised values: 690 (65.40 %)Gaps filled: 0 · Removed: 0Largest correction: 253Detected: 2026-11-12 18:13
Generación programada P48 Exportación Portugal#103 · 2026-11-09 / 2026-11-12Revised values: 10 (2.62 %)Gaps filled: 0 · Removed: 0Largest correction: 37.35Detected: 2026-11-12 18:11
Generación programada P48 Exportación Francia#102 · 2026-11-09 / 2026-11-12Revised values: 14 (3.66 %)Gaps filled: 0 · Removed: 0Largest correction: 61.125Detected: 2026-11-12 18:11
Generación programada P48 Genéricas#97 · 2026-11-09 / 2026-11-12Revised values: 3 (3.36 %)Gaps filled: 1 · Removed: 0Largest correction: 2.175Detected: 2026-11-12 18:11
Generación programada P48 Importación Portugal#99 · 2026-11-09 / 2026-11-12Revised values: 13 (3.78 %)Gaps filled: 1 · Removed: 0Largest correction: 75Detected: 2026-11-12 18:11
Generación programada P48 Importación Francia#98 · 2026-11-09 / 2026-11-12Revised values: 1 (2.15 %)Gaps filled: 3 · Removed: 0Largest correction: 3.15Detected: 2026-11-12 18:11
Generación programada P48 Consumo bombeo#95 · 2026-11-09 / 2026-11-12Revised values: 2 (0.66 %)Gaps filled: 0 · Removed: 0Largest correction: 158.25Detected: 2026-11-12 18:11
Generación programada P48 Solar térmica#85 · 2026-11-09 / 2026-11-12Revised values: 8 (2.43 %)Gaps filled: 0 · Removed: 0Largest correction: 10.125Detected: 2026-11-12 18:11
Generación programada P48 Biomasa#91 · 2026-11-09 / 2026-11-12Revised values: 10 (2.61 %)Gaps filled: 0 · Removed: 0Largest correction: 8Detected: 2026-11-12 18:11
Generación programada P48 Solar fotovoltaica#84 · 2026-11-09 / 2026-11-12Revised values: 8 (2.83 %)Gaps filled: 0 · Removed: 0Largest correction: 41.15Detected: 2026-11-12 18:10
Generación programada P48 Eólica terrestre#82 · 2026-11-09 / 2026-11-12Revised values: 30 (7.83 %)Gaps filled: 0 · Removed: 0Largest correction: 57.65Detected: 2026-11-12 18:10
Generación programada P48 Turbinación bombeo#73 · 2026-11-09 / 2026-11-12Revised values: 3 (1.16 %)Gaps filled: 0 · Removed: 0Largest correction: 102.75Detected: 2026-11-12 18:10
Generación programada P48 Ciclo combinado#79 · 2026-11-09 / 2026-11-12Revised values: 20 (5.22 %)Gaps filled: 0 · Removed: 0Largest correction: 400.575Detected: 2026-11-12 18:10
Generación programada P48 Hidráulica no UGH#72 · 2026-11-09 / 2026-11-12Revised values: 8 (2.09 %)Gaps filled: 0 · Removed: 0Largest correction: 1.925Detected: 2026-11-12 18:10
Generación programada P48 Hidráulica UGH#71 · 2026-11-09 / 2026-11-12Revised values: 7 (1.83 %)Gaps filled: 0 · Removed: 0Largest correction: 167.75Detected: 2026-11-12 18:10
Precio medio ponderado regulación terciaria a subir de activación directa (AD)#10400 · 2026-11-09 / 2026-11-12Revised values: 2 (0.52 %)Gaps filled: 0 · Removed: 0Largest correction: 201.95Detected: 2026-11-12 18:07
Precio medio ponderado regulación terciaria a subir de activación programada (AP)#10398 · 2026-11-09 / 2026-11-12Revised values: 10 (2.61 %)Gaps filled: 0 · Removed: 0Largest correction: 200.01Detected: 2026-11-12 18:07
Asignación a subir de energías mFRR SEE#10395 · 2026-11-09 / 2026-11-12Revised values: 1 (2.23 %)Gaps filled: 0 · Removed: 0Largest correction: 390Detected: 2026-11-12 18:07
Generación prevista Solar#10034 · 2026-11-12 / 2026-11-21Revised values: 640 (71.75 %)Gaps filled: 0 · Removed: 0Largest correction: 2,534Detected: 2026-11-12 18:05
Demanda programada P48 total#10027 · 2026-11-09 / 2026-11-12Revised values: 32 (8.36 %)Gaps filled: 0 · Removed: 0Largest correction: 539.375Detected: 2026-11-12 18:05
Saldo total interconexiones programa p48#10026 · 2026-11-09 / 2026-11-12Revised values: 30 (7.83 %)Gaps filled: 0 · Removed: 0Largest correction: 75.925Detected: 2026-11-12 18:05
Generación programada P48 Eólica#10010 · 2026-11-09 / 2026-11-12Revised values: 30 (7.83 %)Gaps filled: 0 · Removed: 0Largest correction: 57.65Detected: 2026-11-12 18:05
Generación programada P48 Saldo Portugal#10014 · 2026-11-09 / 2026-11-12Revised values: 20 (5.22 %)Gaps filled: 0 · Removed: 0Largest correction: 75.925Detected: 2026-11-12 18:05
Generación programada P48 Cogeneración#10011 · 2026-11-09 / 2026-11-12Revised values: 27 (7.05 %)Gaps filled: 0 · Removed: 0Largest correction: 12.225Detected: 2026-11-12 18:04
Generación programada P48 Carbón#10008 · 2026-11-11 / 2026-11-12Revised values: 6 (6.00 %)Gaps filled: 0 · Removed: 0Largest correction: 8.75Detected: 2026-11-12 18:04
Necesidad cubierta de energías mFRR a subir de activación programada#1892 · 2026-11-09 / 2026-11-12Revised values: 4 (1.04 %)Gaps filled: 0 · Removed: 0Largest correction: 1,670Detected: 2026-11-12 18:03
Precio medio horario final comercializadores de referencia suma de componentes#10212 · 2026-11-09 / 2026-11-12Revised values: 192 (50.13 %)Gaps filled: 0 · Removed: 0Largest correction: 164.11Detected: 2026-11-12 18:02